7346 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
4/19/2022 |
Sanaag |
ceerigaabo |
Balibusle |
5.0 |
— |
— |
Balibusle borehole |
— |
10.050162 |
48.586563 |
1023.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
10800 |
1500 |
— |
6000 |
— |
— |
350.0 |
pvc |
8.0 |
300.0 |
8.0 |
12.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
16.0 |
Galvanised Steel |
— |
— |
— |
2 |
yes |
7 |
9.0 |
Submersible Pump |
— |
— |
— |
Generator |
LTG185G1 |
30.0 |
— |
— |
fair |
The village has no water supply system.
No water kiosks in the village |
no |
— |
32.1 |
7.1 |
3930.0 |
1977.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.04 |
yes |
— |
— |
— |
GUMCO |
— |
13/02/2021 |
Replacement of distribution pipe line |
1: Amergrncy replacement of main raising pipes and submersible pump
2: Generator
3: Solar
4: Construction of another elevated water tank.
5: Construction of 2 animal water troughs.
6: Replacement of rusted distribution pipes.
7: Construction of caretaker room.
8: Construction of another borehole due to water demand |
— |
8250 |
— |
Borehole |
Somaliland MoWRD |
4/19/2022 |
Sanaag |
ceerigaabo |
Cerigabo |
1.0 |
British government |
17/12/1956 |
Laanqiciya Borehole 1 |
— |
10.661012 |
47.297836 |
1915.0 |
— |
1 |
— |
rural urban |
yes |
— |
No |
1. Well destoryed |
30000 |
300 |
400 |
2000 |
3.0 |
— |
120.0 |
gi |
8.0 |
— |
1.0 |
12.0 |
100.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
PVC |
100.0 |
1 |
1 |
2 |
no |
— |
— |
Submersible Pump |
Luwera |
11.0 |
30.0 |
Generator |
Parkins |
30.0 |
— |
— |
poor |
Poor water supply due to long time existance of well without rehabilitation. |
no |
— |
0.0 |
— |
— |
— |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
0 |
1.Emergency new bore hole drilling.
2. Solar panne system installation. |
— |
8210 |
— |
Dam |
Somaliland MoWRD |
4/19/2022 |
Woqooyi Galbeed |
hargeisa |
Kaabada settlement |
0.1 |
ASAL ORG. |
16/05/2019 |
Kaabada galbeed Dam |
— |
9.055013 |
43.955036 |
1299.0 |
— |
0 |
— |
rural |
no |
11 |
Yes |
— |
20000 |
1000 |
500 |
10000 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
3.0 |
54.0 |
45.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
300 |
0 |
0 |
no |
— |
— |
No Pump |
— |
— |
— |
— |
— |
— |
— |
— |
fair |
No supply system becouse it has no infrustracture. |
no |
— |
32.0 |
8.0 |
183.0 |
13.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
— |
All infrastructure |
— |
8279 |
— |
Dam |
Somaliland MoWRD |
4/19/2022 |
Woqooyi Galbeed |
hargeisa |
Saed Mosa |
0.6 |
Community |
— |
Saed Mosa Dam |
— |
9.190982 |
43.950436 |
1276.0 |
— |
0 |
— |
rural |
no |
8 |
No |
Before 7 months |
2450 |
500 |
100 |
5000 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
1.0 |
60.0 |
40.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
350 |
0 |
0 |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
poor |
There is no supply system becouse of no water and other infrastructures. |
no |
— |
0.0 |
— |
— |
— |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
— |
Extension of the dam, geomembrane and all other infractructures. |
— |
7858 |
— |
Borehole |
Somaliland MoWRD |
4/19/2022 |
Woqooyi Galbeed |
hargeisa |
Gumar village
|
1.0 |
AL-HUDA |
15/06/2018 |
GUMAR borehole |
— |
9.1177635 |
43.90028 |
1307.0 |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
15000 |
10000 |
3000 |
30000 |
2.0 |
— |
343.0 |
gi |
8.0 |
255.0 |
5.6 |
17.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Steel tank |
85.0 |
PVC |
2000.0 |
2142 |
1 |
3 |
no |
— |
— |
Submersible Pump |
Grundfos |
5.6 |
284.0 |
Hybrid - Solar/Generator |
Perkins |
65.0 |
Techincal data |
21.6 |
good |
The supply system of gumar is fair and free. |
no |
— |
30.0 |
7.7 |
3140.0 |
2200.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
AL-HUDA |
— |
19/12/2021 |
Pump replacement. |
Borehole Development or or
Borehile relocating. |
— |
8171 |
— |
Borehole |
Somaliland MoWRD |
4/19/2022 |
Sanaag |
ceerigaabo |
Cerigabo |
2.0 |
Community |
19/04/2022 |
Borehole Tirike |
— |
10.587469 |
47.359116 |
1757.0 |
— |
1 |
— |
urban rural |
yes |
— |
Yes |
— |
7000 |
170 |
156 |
1700 |
1.0 |
— |
340.0 |
gi |
8.0 |
230.0 |
18.0 |
12.0 |
2.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
Galvanised Steel |
200.0 |
1 |
4 |
2 |
yes |
12 |
10.0 |
Submersible Pump |
Luwera 15 |
18.0 |
120.0 |
Solar |
— |
— |
330 |
330.0 |
good |
Well functioning water supply system |
no |
— |
24.0 |
7.6 |
700.0 |
700.0 |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
0 |
1. Generator
2.Pump |
— |
7847 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
4/19/2022 |
Sool |
taleex |
Xerta-taleex |
3.0 |
ACTED |
3/4/2020 |
Xerta-taleex BH |
— |
9.100843 |
48.430626 |
512.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
750 |
800 |
— |
1050 |
0.0 |
— |
80.0 |
pvc |
8.0 |
— |
18.0 |
12.0 |
— |
0.4 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
20.0 |
PVC |
2000.0 |
10 |
3 |
3 |
no |
— |
— |
Submersible Pump |
Lowara |
7.5 |
65.0 |
Hybrid - Solar/Generator |
Parkins |
30.0 |
JCNS-36V360W |
10.8 |
good |
— |
yes |
Colorless and odorless |
35.1 |
7.4 |
3360.0 |
2251.3 |
— |
Utility/Local Authority |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
— |
1. Extension pipelines
2. Rehabilitation of riser pipes
3. Replacement of new generator
4. Construction of generator room |
— |
8183 |
— |
Borehole |
Somaliland MoWRD |
4/19/2022 |
Sanaag |
ceerigaabo |
Cerigabo |
2.5 |
Kuwait charity |
1/4/2015 |
Laaqiciya 1 bore hole |
— |
10.643682 |
47.303726 |
1875.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
1000 |
180 |
400 |
3000 |
1.0 |
— |
172.0 |
gi |
8.0 |
160.0 |
1.0 |
12.0 |
15.0 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
24.0 |
Stainless Steel |
100.0 |
1 |
3 |
3 |
yes |
2 |
10.0 |
Submersible Pump |
Luwara |
11.0 |
45.0 |
Hybrid - Solar/Generator |
Parkins |
30.0 |
572350 |
350.0 |
good |
Properly functining well |
no |
— |
32.0 |
7.7 |
550.0 |
843.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
0 |
1. New pipline installation
1.5 km to school installation.
2. Increase the depth of borehole 7m. |
— |
8272 |
— |
Dam |
Somaliland MoWRD |
4/18/2022 |
Woqooyi Galbeed |
hargeisa |
Salaxley Dam |
1.0 |
Somaliland MoWRD |
15/05/2020 |
Salaxley Dam |
— |
9.009777 |
44.20992 |
1211.0 |
— |
0 |
— |
rural urban |
no |
8 |
No |
7 months becouse the work is going on and no more rain fall. |
30000 |
4000 |
150 |
10000 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
3.0 |
150.0 |
100.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
25.0 |
— |
— |
4300 |
0 |
0 |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
No supply the water source dried. |
no |
— |
0.0 |
— |
— |
— |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
— |
The work is still continue |
— |
7724 |
— |
Borehole |
Somaliland MoWRD |
4/18/2022 |
Sanaag |
ceerigaabo |
Erigavo |
4.0 |
GTZ |
18/04/1987 |
Gtz old |
— |
10.6344385 |
47.35547 |
1784.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
1200 |
0 |
0 |
500 |
100.0 |
— |
200.0 |
pvc |
8.0 |
20.0 |
18.0 |
16.0 |
0.5 |
0.2 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
PVC |
1000.0 |
0 |
0 |
0 |
no |
— |
— |
Submersible Pump |
Luwara |
7.0 |
60.0 |
Hybrid - Solar/Generator |
Parkin |
45.0 |
Rsm144/6/415m |
415.0 |
good |
Supply systems is good condition |
no |
— |
30.0 |
7.4 |
800.0 |
1000.0 |
— |
Utility/Local Authority |
— |
— |
— |
— |
yes |
0.01 |
no |
— |
— |
— |
Somaliland MoWRD |
— |
18/04/2019 |
Caretaker room |
No |
— |