Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7962 Dug Well Somaliland MoWRD 3/31/2022 Awdal lughaye Cabdi geedi 1.0 Islamic Relief 24/03/2022 Cabdi geedi dugwell 10.507224 44.05942 -18.0 1 rural urban yes Yes 1500 2000 0 15000 0.0 14.0 12.0 1.0 17.0 Other 0.0 Other 0.0 220 0 0 no No Pump poor No supply system no 31.5 7.86 2050.0 1450.0 Communal no no no Islamic relief dug new dugwell but not functioning right now it is covered. 21/03/2022 New dug well constraction y That has no other infrustructures The constraction of reservior, pipeline of 2000m, solar instalation, construction of care taker room, pump, generator, animal troughs, kiosks.
8657 Borehole Puntland Ministry of Energy Minerals and Water 3/31/2022 Togdheer buuhoodle Xamar lagu xir 1.0 UNICEF 28/03/2022 Xamar lagu xir BH 8.144876 46.59935 609.0 1 yes No It is new borehole, and water system under construction 360.0 pvc 8.0 239.0 15.0 2.0 no 1. Installation of solar power 2. Fencing of borehole
7156 Borehole Somaliland MoWRD 3/31/2022 Togdheer buuhoodle Qabri Hulul 0.2 IR 1/1/2016 Qabri Hull borehole 8.685275 46.278206 832.0 1 rural yes Yes 2400 400 0 2800 0.0 333.0 pvc 8.0 270.0 15.0 2.0 Concrete/Masonry tank 40.0 Galvanised Steel 25.0 400 1 8 yes 4 8.0 Submersible Pump Luara 15.0 300.0 Hybrid - Solar/Generator JP45 45.0 GPM300 300.0 good The condition of the solar system and has spare parts no 36.0 7.3 1000.0 394.0 Communal no no yes IR 1/2/2016 Construction of new borehole Rehabilitation of reservoirs and animal trough installation
7279 Borehole Somaliland MoWRD 3/31/2022 Awdal lughaye Garaaca 7.0 Kuwait Government 28/07/2020 Garaaca jaleelaale Borehole 10.60117 43.82159 0 rural urban yes Yes 1400 2000 0 4000 0.0 92.0 gi 8.0 40.0 4.0 10.0 0.0 0.0 Concrete/Masonry tank 40.0 PVC 1200.0 200 1 2 no Submersible Pump Unkown 0.0 0.0 Solar DS572380M 4.18 fair Very good water supply system no 31.1 7.95 3830.0 2700.0 Communal no yes 0.006 yes No intervention Funce replacement, pipe replacememt, machine with caretaker room, new tank.
7280 Borehole Somaliland MoWRD 3/31/2022 Awdal lughaye Geerisa 0.2 Kuwait Government 26/08/2015 Geerisa 1 10.609091 43.43429 232.0 2 rural urban yes Yes 16000 600 0 5000 0.0 68.0 gi 8.0 20.0 5.3 10.0 0.0 0.0 Concrete/Masonry tank 16.0 PVC 2000.0 50 1 4 yes 5 9.0 Submersible Pump Grundfoz 7.5 40.0 Hybrid - Solar/Generator Perkins 30.0 Bp380j 4095.0 fair Very good way and the was satisfy the supply system of the water no 29.1 7.7 1533.0 1100.0 Communal yes 28/11/2012 5 2 yes 0.006 yes Concern Worldwide Somalia 28/07/2017 Solar instalation, borehole protection New tank construction, increasing the supply system, machine replecement becouse it works for a long time
7332 Dug Well Somaliland MoWRD 3/31/2022 Awdal lughaye Geerisa 0.3 DRC - Somaliland 31/03/2006 Geerisa dug well 10.60838 43.432228 208.0 2 rural urban yes Yes 2000 0 0 0 0.0 14.0 12.0 8.5 8.0 Concrete/Masonry tank 12.0 PVC 700.0 100 0 0 no Submersible Pump Grundfoz 2.2 13.0 Generator Lister biter 8.6 fair The supply system is very good and they are very good the people are satisfy no 28.6 7.6 1536.0 1100.0 Communal yes yes 0.006 yes SCI 28/11/2015 Solar instalation Same to the other
7304 Borehole Somaliland MoWRD 3/31/2022 Awdal lughaye Karuure 0.2 Kuwait Government 27/07/2019 Karuure 2 10.7517605 43.591793 68.0 0 rural urban yes Yes 7000 2000 0 10000 0.0 115.0 gi 8.0 85.0 8.0 17.0 0.0 0.0 Concrete/Masonry tank 288.0 Galvanised Steel 2000.0 200 3 4 no Submersible Pump Grundfoz 7.5 95.0 Hybrid - Solar/Generator Perkins 45.0 DS572390M 3240.0 fair Ok no 33.0 7.17 3520.0 2520.0 Communal no yes 0.05 yes SCI 27/07/2020 Solar instalation Construction of animal troughs, new tank, solar replacement, pump, generator
8285 Dug Well Somaliland MoWRD 3/31/2022 Awdal lughaye Ceel sheekh 2.0 Somaliland MoWRD 26/08/2019 Ceel sheikh 10.415509 44.290012 -14.0 0 rural urban no 12 No On year before 1400 0 0 0 0.0 17.0 10.0 0.0 0.0 Concrete/Masonry tank 25.0 PVC 4000.0 0 0 0 no No Pump poor No supply at all no 0.0 Communal no no no No intervention New submersible pump and its instalation.
7119 Borehole Somaliland MoWRD 3/31/2022 Togdheer buuhoodle Goljano 3.0 Somaliland MoWRD 31/03/2022 Goljano borehole 8.632524 46.570896 778.0 1 rural yes Yes 72000 300 100 10000 0.0 350.0 pvc 8.0 150.0 5.0 12.0 Concrete/Masonry tank 34.0 Galvanised Steel 35.0 1200 0 4 yes 9 9.0 Submersible Pump 7.0 15.0 Hybrid - Solar/Generator Lens Italy 60.0 Photovoltiac 415.0 good The supply system is automatically functioning simultaneously but the system did not installed to the village no 35.0 7.5 900.0 5600.0 Communal yes 1/6/2021 3 2 no yes NRC 1/1/2022 Constructed Water Reservior and installation Fence and installing water supply system to the village and caretaker room
7343 Borehole Puntland Ministry of Energy Minerals and Water 3/31/2022 Sool las_caanood Karin korfood 0.7 ISRC 31/03/2012 Karinkarfood BH 8.127103 47.7511 698.0 1 urban rural yes Yes 6300 1200 500 13000 0.0 290.0 pvc 8.0 4.0 12.0 8.0 Concrete/Masonry tank 50.0 Galvanised Steel 1000.0 15 2 3 yes 30 8.0 Submersible Pump Lowara 7.5 260.0 Hybrid - Solar/Generator Parkins 60.0 300w 18.0 fair yes Colorless and odorless 27.8 7.5 4850.0 2423.0 Communal yes 31/03/2014 6 3 yes 0.1 yes Drilling new borehole during to trucking much. 1. Rehabilitation of solar panels 2. Rehabilitation of animal troughts 3. Trucking point. 4. Construction of new elevated tank. 5. Rehabilitation of generator and caretaker rooms 7. Pipelines rehabilitation. 7. Fancing of borehole