Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8027 Borehole Somaliland MoWRD 3/30/2022 Togdheer buuhoodle Ceegaag 4.5 Karteask canada 30/03/2014 Ceegaag borehole 2 8.617841 46.502403 799.0 2 rural urban yes Yes 600 14000 100 11000 0.0 360.0 pvc 8.0 80.0 16.0 5.0 Concrete/Masonry tank 40.0 Galvanised Steel 170.0 5000 2 2 yes 10 8.0 Submersible Pump GRoundfors 16.0 280.0 Hybrid - Solar/Generator JP65 65.0 Photovoltaic Module 300 300.0 poor The town population is increased for the last years since it was established, pipeline rehabilitation is neede, Galvanized pump. no 34.0 7.1 1540.0 2100.0 Communal no no no SC-UK 30/03/2017 Upgrading ceegaga borehole construction of RCC elevated water tank with animal throughs Extension of water kiosk, pvc and Galvanized pump rehabilitation of pipeline.
8051 Borehole Somaliland MoWRD 3/30/2022 Togdheer buuhoodle Faarah Bullay 3.0 UNICEF 24/12/2010 Farah Bullay Borehole 8.221453 46.352642 625.0 1 rural urban yes Yes 85000 5000 0 6000 0.0 365.0 pvc 8.0 330.0 60.0 12.0 Other PVC 4.0 36000 9 6 yes 20 20.0 Submersible Pump Laura 6.0 330.0 Hybrid - Solar/Generator JP45 60.0 BRM300W 300.0 good The no 30.0 7.1 1400.0 2600.0 Communal yes 14/04/2010 5 3 no no UNICEF 30/03/2022 Rehabilitation of borehole Hhsygssg
7886 Borehole Puntland Ministry of Energy Minerals and Water 3/30/2022 Sool las_caanood Hadhwanaag 0.9 UNICEF 30/03/2018 HadhwanaagBH 8.532261 48.16989 492.0 1 urban rural yes Yes 1750 800 5000 2.0 80.0 pvc 8.0 24.0 28.5 14.0 4.5 0.2 Concrete/Masonry tank 25.0 PVC 900.0 0 4 2 yes 15 8.0 Submersible Pump Lowara 11.0 65.0 Hybrid - Solar/Generator Parkins 20.0 BYD400-MIK-36 8.0 good yes Colorless and odorless 33.8 7.38 2670.0 1330.0 Communal yes 30/03/2018 7 no no KAALO Relief and Development 30/12/2021 2. Installation of solar power 1. Rehabilitation of koisks 2. Operator supporting 3. Fencing borehole area
7123 Borehole Puntland Ministry of Energy Minerals and Water 3/30/2022 Sool las_caanood Buuro- wadal 0.4 ICRC 30/03/2011 Buuro wadal BH 8.501663 48.26411 475.0 1 urban rural yes Yes 2000 800 1200 0.0 84.0 pvc 8.0 6.6 12.0 4.0 Concrete/Masonry tank 20.0 Galvanised Steel 1200.0 0 4 2 yes 6 8.0 Submersible Pump Lowara 7.5 75.0 Hybrid - Solar/Generator Parkins 30.0 BYD400MIK-36 8.0 good yes Colorless and odorless 33.5 7.43 3050.0 1526.0 Communal yes 30/03/2011 3 2 yes 0.1 yes KAALO Relief and Development 30/12/2021 1. Installation of solar power 1. Rehabilitation of solar. 2. Rehabilitation of riser pipes and pipelines.
7529 Dug Well Somaliland MoWRD 3/30/2022 Awdal zeylac caasha caddo 0.25 DRC 30/12/2006 Aasha caddo 11.174736 43.44064 4.0 100 urban yes Yes 3500 8.0 4.0 1.5 10.0 1.5 7.0 Concrete/Masonry tank 8.0 PVC 950.0 500 6 2 no Submersible Pump Grundfoz 1.7 7.0 Solar Jt-200 1.2 good The supply is poor becouse the yeid of the dug well is low no 31.4 8.26 1908.0 1270.0 Communal yes 16/07/2016 4 3 yes 0.05 no UNICEF 23/11/2021 Bump replacement Exploration of new boreholes and drilling new boreholes
8306 Borehole Somaliland MoWRD 3/30/2022 Togdheer buuhoodle Carro weyn 0.5 Carro weyn foundation 29/02/2020 DurDur Borehole 8.482323 46.575348 763.0 1 rural yes Yes 4000 500 0 3000 0.0 360.0 pvc 8.0 0.0 3.0 1.0 Concrete/Masonry tank 24.0 PVC 600 4 yes 5 8.0 Submersible Pump Laura 5.0 270.0 Hybrid - Solar/Generator JP45 45.0 DS572380M Photovoltaic Module 380.0 good The supply system is functioning no Communal yes 21/03/2020 5 0 no no Oxfam Novib 25/10/2020 Supply and installation of solar system of carro weyn borehole Gg
8039 Borehole Somaliland MoWRD 3/30/2022 Togdheer buuhoodle Dan-Dan 1.0 IR 16/02/2016 Dan Dan Borehole 8.251394 46.529537 649.0 1 rural urban yes Yes 2000 10000 200 15000 0.0 370.0 pvc 8.0 260.0 48.0 10.0 Concrete/Masonry tank 36.0 PVC 1500.0 12000 4 5 yes 10 16.0 Submersible Pump GRoundfors 15.0 280.0 Hybrid - Solar/Generator P50-3000 50.0 The solar isn't functioning 330.0 good The supply system is good however the pipeline of the village needs to change from Galvanized to PVC no 34.0 7.2 1470.0 2300.0 Communal no no no CARE Somalia 30/03/2021 Installation of submersible pump 15KW and cable, Installation of rising pipes, Construction of elevated water tank 25Cubic meters, construction of camel troughs, rehabilitation of goat through and water kiosk, rehabilitation of supply system, supply and installation of solar inverter. Currently the needs of this borehole are supply and installation of solar system which is not functioning, moreover, the pipeline of the village needa to change and install PVC.
8239 Borehole Somaliland MoWRD 3/30/2022 Togdheer buuhoodle Buhoodle 1.0 Oxfam novib 19/12/2021 Bayir Borehole 8.244555 46.320282 615.0 4 rural urban yes Yes 1500 500 0 12000 0.0 370.0 pvc 8.0 80.0 8.0 5.0 10.0 Other Other 0 0 0 no Submersible Pump Laura 8.0 280.0 Generator JP60 60.0 good The suppyl system is under construction now no 0.0 Communal no no no The borehole is now under construction The borehole is now under construction
8041 Borehole Somaliland MoWRD 3/30/2022 Togdheer buuhoodle Ceegaag 1.0 UNICEF 14/10/2011 Ceegaag Borehole 8.616949 46.494602 792.0 0 rural yes Yes 300 500 0 500 0.0 350.0 pvc 8.0 312.0 15.0 6.0 Concrete/Masonry tank 14.0 PVC 1200.0 900 5 4 yes 5 8.0 Submersible Pump Groundfors 40.0 213.0 Hybrid - Solar/Generator JP45 45.0 Photovoltaic Module 300.0 good no 34.0 7.1 1450.0 2600.0 Communal yes 23/11/2018 5 3 no no No interventions carried out recently Fence, change cable, change of pump, increase number of animal throughs.
7240 Dug Well Puntland Ministry of Energy Minerals and Water 3/30/2022 Sool las_caanood Boocame 0.0 Community 30/03/2003 Boocame dug well 8.396971 47.94041 488.0 1 urban rural yes Yes 10000 750 170 1700 0.0 9.0 9.0 15.0 2.0 Concrete/Masonry tank 20.0 PVC 2500.0 300 0 3 yes 15 8.0 Submersible Pump Lowara 4.0 8.0 Hybrid - Solar/Generator Parkins 13.0 15.0 poor Needs full rehabilitation yes Colorless and odorless 30.5 7.32 3110.0 2083.0 Utility/Local Authority yes 0.1 yes Agency not specified 30/03/2018 1. Installation of solar power 1. Construction of koisks. 2. Construction of new elevated tank.